Items Included
NOTICE: Please inspect the unit thoroughly before installation to make sure it has not been damaged during transportation. Under no circumstances should a damaged unit be installed. Neither the manufacturer nor the distributor will be responsible for removal or reinstallation costs should a replacement be necessary due to the installation of a damaged unit.
PRE-INSTALLATION PLANNING
- The unit must be placed within the bathroom area before completion of door framing or, if preferred, studs may be omitted or knocked out to permit unit placement.
- Review job print and manufacturer rough-in dimensions; verify all key dimensions against actual job conditions. Make sure framed-in alcove is of proper size, square and plumb; check the floor for levelness.
- The blocks and/or legs attached underneath the bottom of the bath fixture are an integral part of the support system and should not be removed. Although these blocks and/or legs need not touch for an acceptable install, this may be an indication that the unit and/or sub-floor are out of level. The manufacturer recommends shim, or support with foundation material, any gap under the blocks and/or legs.NOTE: It is a best practice in the industry to set the unit in foundation material. Industrial plaster, mortar mix, or non-shrink grout are recommended for firmer bottom support.
- If a fire-rated alcove is required, approved finish material must be in place prior to unit installation to meet fire safety requirements of local building code and/or FI–IA/i–IUD Minimum Property Standards. NOTE: Finished alcove must-have interior dimensions shown on the rough-in diagram to permit installation of the unitShowers: Provide 6″ (150mm) floor opening for 2″ (50mm) IPS and drain connection.
- Tub-Showers: Provide 6 x 12 (130 x 300) floor opening for 1 1/2″ (40mm) drain, waste, and overflow (DWO) kit. NOTE: Be sure floor opening location matches bah fixture drain location.
- To avoid obstruction, make sure that supply lines and valve plumbing are not strapped to studs and do not project Into Also, drain pipe must not project above floor level prior to installation.
- Make sure all plumbing is complete and to code.
- To prevent scuffing while installing the unit, cover the entire bottom of the unit with a piece of cardboard or other protective
- Fasten drain fitting to the unit before installing [see manufacturer’s instructions].NOTE: Fasteners for wood framing— 1 /11 galvanized roofing nails or ii 10 x 11/2″ self-tapping washer head screws; for concrete or block walls-1″ concrete nails and nailing tool; for steel studs (18 ga.)—drill flanges and studs with 3S2″ carbide bit and use # 12 × I ” sheet metal screws.
INSTALLATION PROCEDURE
If mounting finings — from stable reference points (back wall studs, floor) measure the locations of spout and valves. Note measurements below. For showers, refer to Diagram 2A; for tub-showers, refer to Diagram 2B.
Note measurements here:Tab F iller: _____________________________________________________Valve: _____________________________________________________Shower Arm: _____________________________________________________Valve: _____________________________________________________
(Mark dimensions only if shower arm is Plumbed within wall area.J
Mark tilting locations. (Refer to measurements Tom step ‘2.} Using a Role saw (fine tooth or abrasive grit cutting eclge), make necessary openings fof filler and valves, drilling from inside (smooth side) out.
Note: Use of foundation material is highly recommended for firmer bottom support. Prepare a foundation material mix (industrial plaster, mortar mix). Place three or four mounds on the subfloor around but away from the drain hole. The mounds should be high enough so that when the unit is set, it will cause the foundation material to displace and spread. For showers, refer to Diagram 4k for tub-showers, refer to Diagram 48.
Place the unit into framing wilh drain fitting over and onto waste pipe with threshold firmly on the floor.
Assure waste pipe protrudes well into drain tilting. Maintain proper Boor slope towards the drain.
CHECK FOR LEVEL
Predrill pilot holes. fasten panel to horning at every stud and eight inches vertically through nailing flange. When other than cementitious backer board plaster is to be used, furring strips as thick as nailing flanges are recommended for installation on studs above the installed unit to assure walls will be flush. 100% silicone with mildew resistant properties should be applied between the backer board and horizontal surface of unit. Then finished wall materials can be applied.
CLEAN-UP
- Do not remove warranty/maintenance adhered label. heave on unit for owner/occupant per code requirement.
- Prevent staining. Remove all debris before plumbing leak test. Use a sponge with warm water and liquid detergent. Rinse, drain and wipe clean. Do not use abrasive cleaners such as scouring powders, steel wool, metal scrapers, sandpaper or anything else that might mar, dull or scratch the finish.
- Plaster and latex paint may be removed with warm water, liquid detergent and brittle brush or plastic scraper. Glues, tars and enamels may be removed with acetone or paint thinner. Do not use turpentine or laquer thinner. Do not use excessive heat or any caustic solvents or chemicals.
- Dull areas and light scratches may be removed by buffing with a light-colored automotive rubbing compound and buffing pad. Entire unit can be waxed with light-colored automotive wax. Do not wax bottom of unit.
- See user maintenance label for more details.
USER MAINTENANCE INSTRUCTIONS
IMPORTANT! Use on recommended cleaners and procedures described herein. Use of other materials and methods may damage your bath fixture and void the warranty.
- For normal cleaning: Never use abrasive cleaners such as scouring powders or pads, steel wool, scrapers, sandpaper or anything else that could scratch or dull the surface of your unit. Instead, use warm water and liquid detergents or non-abrasive cleansers, especially those bathroom cleaners recommended for cleaning fiberglass.
- To keep your bath fixture sparkling clean: Apply a coat of good quality automotive paste wax or polish and buff to a high shine with a soft cloth or towel. Repeat every six months for easier cleaning and long-lasting protection.NOTE: DO NOT WAX textured, the slip-resistant standing surface of the unit bottom. This could result in greater risk of slipping and personal injury.
- To restore a scratched or dull unit: Use an automotive polishing compound applied with a clean cotton rag. Rub scratches and dull areas vigorously. Wipe off residues. Follow with the automotive wax treatment described above.
- To remove adhesive: Try 3-M Natural Cleaner, De-Solv-It or similar materials. If residues remain, saturate a small, white, cotton rag with nail polish remover (naphtha or acetone) and rub vigorously until the adhesive dissolves and disappears These solvents are highly flammable and must be used sparingly and with caution. Do not smoke or permit others to do so. Make sure all nearby heating devices (including pilot lights) are extinguished. Do not allow solvent to go down the drain. Make sure not to contact plastic drain grates or other synthetic materials.
- Rubber Mats: If you use a rubber ‘anti-skid” mat, make sure to remove it from the unit after each use to avoid harm to the surface finish.
- Hard Water: Water in certain regions, if not wiped up after bathing/showering, may cause fading of some bath fixture colors. This is a natural occurrence beyond the manufacturer’s control. (See Warranty)
CAUTION: When using any cleaning or polishing materials, make sure to read and follow all package instructions carefully. Wear rubber gloves at all times and avoid contact with eyes, skin, clothing, rugs and furnishings. Make sure all residues are rinsed off thoroughly.Technical Services / Service technique / Servicio tecnicoT. 800-930-0050 F. 800-930-0051www.laurelmountainbath.com