KAMADOJOE CGK22HG1 Kettle Joe Body Kit Installation Guide

Table of Contents

KAMADOJOE CGK22HG1 Kettle Joe Body Kit

Before assembly, remove your hinge, band assembly, legs and all the insides of your old grill. You will have to re-use your old hardware and grill parts on the new body installation.

Assembly

  1. Attach old band assembly to the new body. Felt is Pre-Assembled.
  2. Do not tighten legs until after step (4).
  3. Do not tighten legs until after step (4).
  4. Tighten the leg and shelf hardware.
  5. Install hinge to the lid.
  6. Install lid / hinge assembly to body.

KAMADOJOE.COMKAMADOJOE.COM/CONTACTKAMADOJOE.COM/WARRANTYKAMADOJOE.COM/COLLECTIONS/PARTS

References

[xyz-ips snippet=”download-snippet”]


Posted

in

by