Disassembly Procedures
S1
Turn n off the monitor.S2
Place the monitor on a soft cloth along with the desk.
- Removing the monitor stand.
- Place the monitor on a soft cloth or cushion.
- Press and hold the stand release button.
- Lift the stand up and away from the monitor.
S3
Unlock 4 screws on the Rear Cover.
S4
Disassemble Rear Cover from middle frame.Notice the disassembly order:
- Disassemble the top side.
- Disassemble the Left/Right side.
- Disassemble the bottom side.
- Disassemble Rear Cover from the middle frame.
S5
Remove the tape which fixed the USB FFC cable and USB wire on the panel.
S6
Remove USB FFC cable and USB wire from I/F BD.
S7
Tear off the tape from Rear Cover
S8
Unlock a screw-on USB BD and take off USB BD from Rear Cover
S9
Remove USB FFC cable and USB wire from USB BD.
S10
Remove Sensor BD wire from I/F BD and Sensor BDDisassemble SENSOR BD from the panel.
S11
Remove Control BD wire from I/F BD
S12
Remove 4 black tapes from Panel.
813
Remove long and short backlight wire from LED Driver BD.
814
Remove 2 tapes that fixed backlight wire from the panel and middle frame.(See mark)Remove long and short backlight wire from the panel.Unlock 1 TP -S screw (See Blue mark) and disassemble a PANEL BOSS from Middle Frame.Unlock screws on Middle Framea. FHP screws*2.(See Green mark)b. MF BASE screws*3 (See Red mark)
(TP-S Screw Torque: 6.5±0.5kg0 (FPH screw and base Screw Torque: 3.5-4.0kgf)S15
Tear off the yellow tape from Panel and disassemble the LVDS cable from Panel.
S18
Take off Main SHD from Panel.
817
Unlock 11 screws on the Middle frame
S18
Take off Middle frame from Panel Remove 3 tapes from the panel
S19
Remove 1 Gasket from Middle Frame
S20
Unlock 3 screws on the middle frame to take off Control BD ASSY.
S21
Tear off Control BD Mylar from Control BD and take off Control BD FFC cable.Unlock 4 screws on Control BD to disassemble Control BD from Key Button.
(Screw Torque: 1.4-1.45kgf)S22
Take off Mylar from SPS BD.
S23
Unlock 9 PCBA screws.
(Screw T Torque: 8.5 5±0.5kgf)
S24
Disassemble LED Driver BD, BD and SPS BD from Main SHD.Remove all cables and tapes from LED Driver BD. I/F BD and SPS BD.
S25
Unlock 1 Grounding Screw and disassemble AC wire from Main SHD.
(Screw Torque: 8.5±0.5kgf)
S26
Remove electrolyte capacitors (red mark) from printed circuit boards
S26-1 Cut the glue between bulk caps. and PCB with a knife
S26-2 Ensure cutting path within the glue. don’t touch bulk cap. or PCB
S26-3 Take out the bulk cap. pin solder withholding iron and absorber
S26-4 Lift the bulk ca . u and away from thel3C B
Product material information
The following substances, preparations, or components should be disposed of or recovered separately from other WEEE in compliance with Article 4 of EU Council Directive 75/442/EEC.
Capacitors / condensers (containing PCB/PCT) | No used |
Mercury-containing components | No used |
Batteries | No used |
Printed circuit boards (with a surface greater than 10 square cm) | The product has printed circuit boards (with a surface greater than 10 square cm) |
The component contains toner, ink, and liquids | No used |
Plastic containing BFR | No used |
Component and waste contain asbestos | No used |
CRT | No used |
Component contain CFC, HCFC,1-1FC and HC | No used |
Gas discharge lamps | No used |
LCD display > 100 cm2 | Product has an LCD greater than 100 cm2 |
External electric cable | Product has external cables |
Component contains refractory ceramic fibers | No used |
Component contains radioactive substances | No used |
Electrolyte capacitors (height > 25mm, diameter > 25mm) | Product has electrolyte capacitors (height >25mm, diameter > 25mm) |
Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.Tool Description:– Screwdriver– Scraper Bar– Penknife– Soldering iron and absorber
[xyz-ips snippet=”download-snippet”]