QZE10501 Quartz Electric Shower
QUARTZTM ELECTRIC INSTALLATION GUIDE
Aqualisa Products Limited The Flyers Way Westerham Kent TN16 1DE Customer Helpline: 01959 560010 Brochure Hotline: 0800 652 3669 Website: www.aqualisa.co.uk Email: enquiries@aqualisa.co.uk Republic of Ireland Sales enquiries: 01-864-3363 Service enquiries: 01-844-3212
Please place product serial number label here.
Please note that calls may be recorded for training and quality purposes. The company reserves the right to alter, change or modify the product specifications without prior warning. TM Trademark of Aqualisa Products Limited.
5 Nov18 Part No: 438301 Issue 06 Oct20
Important information
Safety information
Connections
This appliance can be used by children aged from 3 years and above andImportant information persons with reduced physical, sensory or mental capabilities or lack ofexperience and knowledge if they have been given supervision or instruction
Quartz Electric is suitable for use with 15mm British Standard pipe and should be connected using a 15mm compression fitting (not supplied). Quartz Electric is suitable for top, bottom or rear entry pipe work and top bottom or rear entry cable. Supply lines should be flushed clear of any debris prior to installation of the unit.
concerning use of the appliance in a safe way and understand the hazards
inInvtorlovdeudc. tion
Connections
Isolating valvesA suitable full bore isolation valve must be fitted to the incoming supply in accordance with the current Water
CQhuailrtdzrEelenctrischisaalslunrfaocetmpoluanytedwinistthanttahneeouas eplepctlriiac snhcowee.r unit which is
Quartz Electric is suitable for use wSuitphp1ly5RmemguBlarittiiosnhsSatannddoaurrdtpeirpmesaonfdwsahroraunldtyb.e
Calveaialanbleininga achnoidce oufspeerrfomrmaanicnetraetningasnc8e.5ksWhaandll9n.5okWt abvaeilambleainde sWuhpitee/rcvhriosmioe nan.d 8.5kW, 9.5kW and 10.5kW available in Satin chrome andGraphite/chrome.
by
childcroennnecwteidthusoinug at for top, bottom or
15mm compression fitting (not supplied). Quartz Electric is suitablerear entry pipeSwiotriknagnd top bottom or rear entry cable. Supply
lines should be flushed clear of anTyhedeQburiasrptzriEolretcotrincsutnailtlamtiounstobfethmeouunnite. d on a flat, vertical
finished
wall
with
the
hose
outlet
pointing
The spray head must be descaled regularly.Quartz Electric’s patented Over Temperature Protection (OTP) device ensures saferWcoAmfRorNtabIlNe sGho:wDeriongnwohiltststhweisthcohweropnroviifdetshenedrleessiescoanopmoicaslssihbowileitriyngtahs iat t theIswolaatteinrginvathlvees
downwards. Any distortion of the back plate may result in the unit not working. Spacers are provided fitted to the service tunnel to enable the unit to be fitted to an uneven wall surface. DO NOT tile up to or use sealants around the Quartz Electric unit. The shower is spaced off the wall by integral
himepaotseesrnoisdefmroanzdeonn.stored hot water.
A suitable full bore isolation valvepmillaursst tboeafliltotwedatior ctihrceuilnactoiomninagrosuunpdptlyheinuancitc.ordance
with the current Water Supply Regulations and our terms of warranty.
FQiutaortznEllyectsrihc ios swupeprliehd ewaithdas2ryeeacrogmuarmanteeen. ded by the manufacturer and never fit any The casing must not be sited where it is subjected to continuous spray from the shower head.
additional device to restrict the water outlet flow.If you have any questions at any stage during installation please contact the Aqualisa
Siting
The Quartz Electric should not be sited in any situation where it is likely to freeze.
Tchusetomoeur htelelptlinme oun s01t9n59o5t60b0e10cfoornadnveicec.ted
to
any
tap
or
fitting
otheThretQhuaarntz
Etlhecotrisc eunit
must
be
mounted on a flat, vertical finished wall with the hose ! WARNING. DO NOT SWITCH THE SHOWER ON IF THERE
IS
A
POSSIBILITY
THAT
THE
SHOWER
COULD
BE
specified.
outlet pointing downwards. Any distortion of the back plate may result in the unit not FROZEN. If you have switched the shower on, SWITCH OFF IMMEDIATELY. Please refer to the trouble shooting
TShaifseatyppinlifaonrmceaitsioinntended to be permanently connected towtohrkeingw. Sapatceerrs amreaprionvisded fittgeudidtoe tohveersleeravfi.ce tunnel to enable the unit to be
aTnhids prnodoutctcmounstnbeeicnsttealdledbbyy aacohmopesteentspeetrs.on in accordance with all relevant
fitted to an uneven wall surface.
current Water Supply Regulations.
DO NOT tile up to or use sealantsParreousnsduthree sQuartz Electric unit. The shower is
A suitable double pole isolation switch for supply disconnecstpiaocendsofmf thueswtalbl bey integral pilClahresctkotahlalotwthaeirdcyirncaumlaitcio(nruanrnoiunngd) wthaeteurnpitr.essure to the Quartz Electric is adequate. A pressure test adaptor is
irbWnAARWueELcQaIlLGeToUiUtSHnsAeHrL.RpLsAOrIETtWFoSFISaIEOErEeuRlaNRDlEeeSpStNP)dRepECEAEREdlNlQSbyeTOUDyiOcNInRCRtBaEeFIrUtNROighITcGLcLILauDeoFOAIIllNWmENafIDGiEItnxNpLTiREoGeOseECtdnGTCTtaHUReUslwIELR.nlCAaRLAiTtAErtLITNiOipCEnoTNSOegnBTNPrUARsNcsIREoLEieVTDCrnIccPTISN,ItuIiOAOGinioNNNtRYn,aMEOGNiFUcnfUEcSBoWLTSoaArTB7IrcNfIE6dcOuS7IaNoT1NrAStSnr(L.WhTdLcAAIeaeLRTLrInIENOwDdcNGeieBtYthwaaiiltslhl.hrcTsTeihhhusloeeerwpcQrveaerurasoaihnnrnedtgtaztumdEw.lccueuscitrttrrinminrcoestguhnboestutslditendotwbheepeQMMrsneriuaiotsnaeivxut:dri:rtdie10szien..stE00dhualM,9eebnfMcjiPywtetatPrcaseiact(idtet1er(ud0e0traoq.tp9tbouitraoehibcrrnseea)ossrwnui):ntrhasieneitdturaeoeoufiottlhsofieswsthpslirehrkaaeoftylrweyofeorntoroftmi8csfrowetlvihetietrezrehe.si.Fnpotelhlorewmmitnhinueitmepruemssuarnedtemsat xaidmaupmtorrefqitutiinregminesnttrsu.ctions opposite to
AOLRLRESPLHACOEMWENETRPSRORDEUCQTUINISRTAILNLAGTIOANNWHEICLHEICS NTORTIICDEANLTICCAOL TNONTHEECTION! WMAURNSINTGB. DEO NOT SWITCH THTEheSHQOuaWrtEzREOleNctrIiFc TshHoEwReErIiSs dAePsOigSnSeIdBItoLIcToYnTtrHoAl Tstatic pressure up to 1.0MPa (10 bar). Where pressures are likely
IPNROSDTUACTLLBEEINDG BREYPLAACEQDU, THAELCIAFBILEESDIZEPSE, CRIRSCOUINT PRFOOTELCLTOIVWE DIEVNICGEST, HE LATTHEESSTHORWEEVR CIOSUILOD NBE FROZENt.oIfexycoeuedha1v.e0MswPiatc(h1e0dbtahre),sahopwreesrsuorne, SreWduITcCinHgOvaFlFve must be fitted into the incoming mains supply. A setting of
OEAFRTBHSBO7N6D7IN1G
A(NWDIARLLIONTGHERRREEQGUUIRLEMAETNITOS ONFSTH)EABNUIDLDICNGERRETGUIFLAITEIODN
TO
ICMUMERDRIAETNELYT. Please
refer
to
0.3MPa (3 bar) is recommended. It the trouble shooting guide overleaf.
should
be
noted
that
daytime
pressures
approaching
8
bar
can
rise
above
the
BMUUSITLBDEIANSSGESSREDEGBYUA L(RAEGTIISTOERNEDS).QUALIFIED ELECTRICIAN AND INSTALLED
stated maximum overnight. A suitable pressure reducing valve is available from Aqualisa.
WINICTOHNSIRDEERFAETIRONENTOCTEHETSIOTEBCOUNIDLITDIOINNSG(seeRtEabGleUbeLloAwT). ION PART P, ANPYreNsEsuWres
The use of other services connected to the water supply to the shower unit may cause the water pressure to drop
INCNNSIOhoRSomTCwTineAUIarlDrLIacuLtTEirnrAeNgPnT@tTRI@2IOO42C04NTVA0EVLOCTRTOIRVET8E3P.H55.DkL4EWAAECVPEIRCMOEEDSN,UET93CA.95P.Tk6RWRATBOHEDIBNUOGCNTRDIE1NI40P3N.5LS.8kGAATWACALENLDAD,TTAIHOLCApENLrhepesCrOcesWkusATsrteuhBHHrateetLIEsttEeCthRsaetHdSadaIdypInaZtSapoEmtrofSirict,its(irnpugrnoninviinsdtgeru)Pbdcew,rtlfaeoiiottwsnteessrtdhpuoetrpreopmestoshiusnreiriteemeinltutisoomeidtefherneeosdquQfuertueihrvaeetridhtcfz.eroTeEwnhleati(sctPctesorhrRivcopeDiurrse.ldas)Fsodtulhelroeqewruetaoftothetrehe. ebe taken into consideration.
REMQCBUratIinRgEMENTS AC(aRrtrEidGge IfuSseTERED)
OF T4H0AE BUILDIN4G0AREGULATI4O5/5N0AMUST BsEhoAweSr Sis EwiSthSinEtDhe mBiYnimum QUA40L/I45FAIED ELEC40T/4R5IACIAN AND45AINSTALLEDQuaIrNtz Electric requires:
To meet European standards, the shower unit features an integral pressure relief device (PRD). The PRD anad dmeagxreimeuomf srheoqwueirreumneitntpsr.otection should an excessive build up of pressure occur within the shower.
provides
CONSIDERATION TO THE SITE CONDITIONS (see table below). Min cable Max cable Min cable Max cable Min cable Max cablesize mm2 run in m size mm2 run in m size mm2 run in m
Max: 1.0MPa (10 bar)
DO NOT operate the shower with a damaged or kinked hose or blocked shower head, as this can cause the PRD to operate. Failure to follow this instruction will invalidate
Min: 0.09MPa (0.9 bar) at a flowtrhaeteguoaf r8anlittreees. per minute
IntroIdnustacllteidoinnQuTayprtez Einlescutlaritcediswaasllurface
10mounted
61
10
instantaneous electric
55shower
unit
10which
is
50available
in
aTchheoiQceuaorftzpeErlefocrtmricasnhcoewer
is
desiTghnedshtowcoernwtroill
ostnalyticfupnrectsisounrecourpretcotl1y.0wMithPath(1e0hobsaer)a. nd
GQraructaraiaounpbrfnghltezsitEeCCol/orel8cinpbch.5dtpurrukeoriiicWdemt’dosderaiip.rntnearudcttne9kni.n5tegkdWOavvea66riTlaebmlepienra3W3t77uhrieteP/rcohtreo1c6m0tioenan(OdT8P35.)535kdWev,ic9e.5eknW11su00arensd s1a0fe.555r00kcWomafvoaritlaabbWbIlleetehssinfhheitoorSteuwaelpdtedirrneiibnnscetgshounrwrotoehhmtseeilaedsitrnaettchnholaidemkteidlnyagtyomtimeaxiecnesphioenrspadesuentsp1rrsduapu.s0ctlreyitMeoti.sonPApnaarosospfe(vpo1ttirvdt0hoeienearbdglcePah(aRorsi)fDnfe,)gea0. aF.8s3pnahrMdibeoluasPwwrsraeeiulclr(tae3iohnnerbvderaaaoidsdlriue)sdiocinaasinstmbretgoeaatcvlvyhloeaemrtltevihgoemseunumealtnruaidnsnetttdeh.ee.
shower purnoinvsiduelasteedndwlaelsls economical showering as it imposes no demand on stored hot water.stated maximum overnight. A suitPalebaleseprfeusllsyucreomremduiscsiinognvtahleveshisoawvearilparbioler tforoumse following
Quartz Electric is supplied with a 2 year guarantee.
Aqualisa.
the shower commissioning procedure detailed overleaf. Failure to do so could cause the PRD to operate and will
If you have any questions at any stage during installation please contact the Aqualisa customTehrehueslpelionfeoothner services connectiendvatolidtahteewthaetegrusaurpapnltyeteo. the shower unit may cause
01959 560010 for advice.
the water pressure to drop belowTthhee mshionwimerumunriteqmuuirsetdb.eThsiitsesdhoovueldr athbearethfoorer sbheower tray
taken into consideration.
as in the event of the PRD operating, water will drain
Shower rating @ 240V Nominal current @ 240V MCB rating
8.5kW 35.4A 40A
9.5kW 39.6A 40A
10.5kW 43.8A 45/50A
from the bottom of the shower unit.Pressure relief device (PRD) To meet European standards, theIsnhoswpeer ucntitiofenatu&resmanaiinntetgeranl parenscsuere relief
CuCsutosmtoemr ehrehlpellipnleine001199559955660001100
Cartridge fuse
40/45A
40/45A
45A
Min cable Max cable Min cable Max cable Min cable Max cable size mm2 run in m size mm2 run in m size mm2 run in m
Installed in Type insulated wall
10
61
10
55
10
50
of cable
Conduit or trunking
6
37
10
55
10
50
CraubnlesCwliphpicehdadrierecthased into the wall must be protected by the use of conduit or
sheathouinnr gibn.usSruiuelardtfeaindcewmallounted 6cables mu3s7t also be p6rotected3b3y a suitab1le0 approve50d
conduit.
device (PRD). The PRD provides aIdnetghreeeinotef rsehsotswoefr suanfiettpyr,owtecrteioconmshmoeunlddatnheexQcueasrstivze GotGaotquaeqryu?erNye?eNdeaedstaocsktoisctk?isOtu?rOhuerlphleinlpeliinseoipsen
build up of pressure occur within tEhleecstrhiocwaenrd. its electrical installation are checked by a qualified electrician at least every 2 years.DO NOT operate the shower with a damaged or kinked hose or blocked shower head,
fromop8e.n00fraommt8o.350.3a0mpmtoM5o.0n0dpamysMtoonTdhauyrstdoaFyrsiday andto8.a0n0sawmertoan5y.0q0upemstioonnsF,rgiduaidyes tyoouantshwroeurgahnyany
Cleaning the filter should only be completed by a as this can cause the PRD to operqautea.liFfaieidlurpeetrsoofno.llPolweatsheisreinfesrtrtuocttihoeninwsitllruincvtaiolindsaotepposite
the product guarantee.
of how to clean the filter.
queasstipoencst, ogfuyidoeuyr oshuotwhreoruingshtaalnlaytiaosnpeocrtaodfviysoeuyrou shoowfeyroinusrtlaolclaatliostnocokrisatd. vise you of your local stockist.
0088000066552233666699 The shower will only function correctly with the hose and handset provided(see shower head installation instArufcttioenrs ionvesrtleaafl)l.aFatiilourne to do so may result in the
Product literature Product literature
operation of the PRD and will invaFalidmaitlieartihsee tphroedeuncdt ugsuearrawnittheet.he Quartz Electric operation
and hand them this guide.
Call our literature hotline to receive the latest
Before removing the shower heater cover, ensure the heater is isolated from the electric mains.
Please fully commission the showCeor mprpiolertteoaunsde pfoollsotwthinegQtuhaerstzhoEwleecrtrcicomgumairsasnioteneincgard procedure detailed overleaf. FailuarendtoodpotiosonacloguuldarcaanutseeetehxetePnRsDiotnoaogpreereamteeannt ddowciullment.
CallAoquuralliitsearaptruordeuhcottblirnoechtourreecceoinvteatinhienglatdeesttails of Aquoaulirsfaupllrroadnugcet obfrodcohmureestciocnptraoidnuincgtsd. Cetoamilsmoefrcial
invalidate the product guarantee.
ourpfruolldruacntgberoocfhduormeseasrteicaplsroodauvcatisl.aCbolemomnerrecqiaulest.
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities or lack of experience and knowledge unless they have been given initial supervision or instruction concerning the use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.
The shower unit must be sited oveDr ea cbalathroartsihoownerotfrayCaosninftohremeveitnyt of the PRD
product brochures are also available on request.Website
Aqualisa Products Limited declares that the Quartz operating, water will drain from the bottom of the shower unit.
Website
electric shower, complies with the essential requirements
wwwwww.a.qauqaulaislias.ac.oc.ou.kuk Inspection
&
and other relevantmainten(a2n01c4e/35/EU) and
provisions of the Low Voltage Directive the EMC Directive (2014/30/EU).
Visit our website for comprehensive product Visiitnofourrmwaetbiosnit,edfeotracilosmofpryeohuernnseivaerepsrtosdtuocctkist and
In the interests of safety, we recommend the Quartz Electric and its electrical
infoirnmstaatllieorns,, dteectahinlsicoafl ayoduvircneeaanredsmt sotroec.kist and
Quartz Electric is suitable for household use only.
installation are checked by a qualified electrician at least every 2 years.
Cables which are chased into the wall must be protected by the use of conduit or sheathing. Surface mounted cables
must also be protected by a suitable approved conduit.
Cleaning the filter should only be completed by a qualified person. Please refer to the
BFeflouresrheminogving the shower heater cover, ensure the heater is isolated from the electric mainisn. structions opposite of how to clean the filter.
QSuoamrtez Emleocdterircnisflusuxietsabcalenfobreheoxutrseemhoelldy ucoserroosnilvye. and, if left in contact, will attack
the working parts of this unit. All soldering must be completed and the pipe work
After installation
Ftlhuorsohuginhlygflushed out in accordance with current Water Supply Regulations prior to
Familiarise the end user with the Quartz Electric operation and hand them this guide.
Scoomnenemctoidoenronfftluhxeepsrcoadnucbte. extremely corrosive and, if left in contact, will attack the workingCpoamrtsploeftethains dunpiot.st the Quartz Electric guarantee card and optional guarantee All soldering must be completed and the pipe work thoroughly flushed out in accordance with current Water Supply
Regulations prior to connection of the product.
extension agreement document.
installers, technical advice and more.Republic of Ireland ReOpuur pbrolidcucotsfaIrereallsao navdailable in the RepublicOuropfrIordeulacntds .aIrfeyaolusonaeveadilaanbyletienchthneicRael paudbvilcice, of Idreeltaanilds.oIff lyoocualnseteodckaisntys oterchhanviecaalnaydvoitchee, r queries, detapillesaosfelpohcaolnset:ockists or have any other queries, please phone:Sales enquiries: 01-864-3363 SaSleesrveincequeinriqeus:ir0ie1s-:80614–834346-33212 Service enquiries: 01-844-3212
Trouble shooting guide
Symptom Possible cause Action
No flow or not enough flow
Power failure (light does not illuminate)Water control knob is turned fully clockwise.Water turned off at mains or servicing valve.SHOWER UNIT SUSPECTED OF BEING FROZEN.
Check power supply, consult electricianTurn flow control knob anticlockwise.Ensure water is turned fully on at the mains and at servicing valve in supply.If so, DO NOT USE. i) Switch off immediately at electrical isolating switch. ii) Turn water off at servicing valve (if fitted) or atstop cock. iii) Contact our Customer Service Department.
There may be an outlet blockage.
Disconnect handset from hose and run the shower. i) If water flows, then handset is blocked with scale ordebris. Clean the handset and spray plate thoroughly. ii) If the water does not flow, remove the hose from theshower outlet. a) If the water flows, the hose is blocked. This could bedue to damage, severe kinking or even an obstruction. Replace with a new hose. b) If the water does not flow, there is a blockage in the plumbing to the shower, the filter or the shower itself. Contact our Customer Service Department if the shower is considered to be the problem.
Blocked inlet filter
Remove the filter for inspection. PLEASE REFER TO INSPECTION AND MAINTENANCE SECTION
Restricted operation of flow control knob
Remove front cover and check operation of knob
Flow adequate but water too cold
Water flow is too high No power to unit
Second stage thermal trip operated
Reduce the flow by turning the water control knob towards the hot temperature markings (clockwise) slowly a) Check isolator switch is on b) Check MCB or fuse at consumer unit c) Check RCD (if fitted) d) Check 230/240V at terminal block (Electrician only) This is a non serviceable part, shower must be replaced
Water too hot Water flow too low
a) Increase the flow by turning the water control knob towards the cold temperature markings (anticlockwise) slowly.b) Ensure that the stop cock and servicing valve are fully open. If so, ask the installer or the local water authority to check that the running pressure is above the minimum requirement (see Pressures section overleaf). This may be apparent during periods of high demand or when other outlets are used.
Spray plate blocked with scale or debris.
Clean the handset spray plate.
Water pressure too low. Check with the installer or local water authority
Water runs from around hose
Pressure relief device (PRD) has operated due to excess pressure build up.
Hose incorrectly fitted.
Water pressure to shower is low or unstable
Turn off electrical isolating switch and water servicing valve and contact our Customer services department.Ensure hose washer is fitted and hose is connected correctly and tightly Check inlet requirements see Pressures section, and ensure no other main water devices are being used while showering
Thermal cut-out is operating, normally making a `click’ sound
Increase the flow by turning the water control knob in the cold temperature direction (anticlockwise). Clean the handset and spray plate.
Poor spray pattern
Scald protection device has activated
Increase the flow by turning the water control knob in the cold temperature direction (anticlockwise). Clean the handset and spray plate.
Multi pattern handset incorrectly setLow water inlet temperature
Adjust spray plate to improve patternFlow rate will naturally be lower when the inlet temperature is low, this applies to all electric showers
Low voltage
Consult electrician
Cleaning & maintenanceYour Quartz Electric unit should be cleaned using only a soft cloth and washing up liquid.DO NOT USE ABRASIVE CLEANERS.To reduce the requirement for chemical descaling in hard water areas, the shower head incorporates rub clean teats. Any scale build up that may occur in any of the holes can be broken down by gently rubbing the flexible tips of the jets during use. This procedure should be completed regularly, as often as once a week in some hard water areas as scale build up can affect the spray pattern and cause the shower to perform poorly.Should chemical descaling of the head become necessary, remove the shower head and fully immerse in a mild proprietary descalent.! IT IS IMPERATIVE THAT DESCALING IS CARRIED OUT STRICTLY IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. SUBSTANCES THAT ARE NOT SUITABLE FOR PLASTICS AND ELECTROPLATED SURFACES MUST NOT BE USED.
Cleaning the filter Cleaning the filter should only be completed by a qualified person.
1. Turn the shower electrical isolating switch off.
2. Isolate the water supply to the shower.3. Carefully remove fixing screws from the top and bottom of the front cover. Carefully pull the front cover away from the unit ensuring the solenoid connector block is detached.
Fig.2
4. Unscrew the two screws on the filter protective cover and remove the filter assembly. (Fig.2).
5. Remove the filter assembly and clean as necessary. (Fig.3).
Fig.3
6. Refit the filter assembly and protective cover. Reassemble the unit in reverse of the above procedure.
Pressure test adaptor fitting instructionsQuartz Electric requires the following dynamic (running) water pressure: Maximum: 1.0MPa (10bar) Minimum: 0.09MPa (0.9bar) at a flow rate of 8lpm To ensure the water pressure to the shower is adequate, we recommend adopting the following procedure: 1. Isolate the electrical supply to the shower. 2. Isolate the water supply to the shower. 3. Remove the fixing screws from the top and bottom of the front cover. Carefully detach the solenoidconnector and pull the front cover clear. 4. Remove the pressure test adaptor from the inside of the front cover. 5. Unscrew the two fixing screws on the filter and remove the filter assembly. 6. Replace the filter assembly with the pressure test adaptor and secure into place using the filterassembly fixings. 7. Connect a pressure testing device to the adaptor (not supplied). 8. Ensuring the electrical supply remains isolated, turn on the water supply to the shower. 9. Push the solenoid piston up until water runs through to the shower unit. 10. Check the reading on the pressure testing device is within the minimum and maximum requirementsstated above. 11. Isolate the water supply to the shower. 12. Detach the pressure test device and remove the adaptor. 13. Refit the filter assembly and secure using the fixings. 14. Refit the pressure test adaptor into the fixing position within the front cover. 15. Reassemble the unit in reverse of the above procedure and turn on the water and electrical supplies tothe shower unit.
Quartz Electric shower with adjustable height head in White/chromeComponents
Literature not shown.
Quartz Electric shower with adjustable height head in Satin chromeQuartz Electric shower with adjustable height head in Graphite/chrome
Quartz®ElectricPipe work installation! In addition to the guide below it is essential that the written instructions overleaf are read and understood and that you have all the necessary components (shown overleaf) before commencing installation. Failure to install the product in accordance with these instructions may adversely affect the warranty terms and conditions. Do not undertake any part of this installation unless you are qualified to do so. Prior to starting, ensure that you are familiar with the necessary plumbing and electrical regulations and legislation required to install the product correctly and safely. The Quartz Electric is supplied with universal fittings intended to secure the unit to a suitable wall. Aqualisa reserves the right to revoke the terms of the warranty should access to service connections be denied by the use of solid setting infill material.1 Carefully remove the red outlet plug assembly.2 Remove the securing screws at the top and bottom of the Quartz Electric front casing and carefully lift the casing away from the back plate assembly. Carefully detach the solenoid connector and pull the front casing clear.3 Carefully unscrew and remove the service tunnel and set aside. (This may be required if retrofitting this shower to an existing shower site).4 Tape the template provided onto the finished wall surface in the desired position and mark the 3 fixing points. Drill and prepare the fixings holes using the fixing kit provided, if suitable.5 If using top or bottom entry pipe work connection, fix the unit to the wall using the screws provided, if suitable.6 Flush through the water supply pipe allowing it to discharge safely to waste.7 Pipe work connection must be made using a 15mm compression elbow for top, bottom or rear entry (not supplied). A copper olive is supplied located on the shower inlet stub and should be fitted into the compression elbow prior to the elbow being connected. ! Rear entry The wall must be sufficiently chased out around the pipe and cable to allow room for the nut on the compression elbow to be recessed into the wall. The pipe work must be connected to the elbow prior to fitting the shower unit to the wall.8 Turn on the water supply to the shower unit and check for leaks up stream of the shower unit. If all is sound turn off the water supply to the shower unit. ! If required, ensure the water pressure to the shower unit is within the minimum and maximum requirements by following the pressure testing procedure overleaf.
Electrical installation! BEFORE ANY ELECTRICAL CONNECTION IS ATTEMPTED, THE ELECTRICITY SUPPLY MUST BE TURNED OFF AT THE MAIN SWITCH. FAILURE TO DO SO COULD RESULT IN ELECTROCUTION.The electrical installation should be carried out by a qualified person in accordance with IEE (Institution of Electrical Engineers) wiring regulations (BS 7671).THIS APPLIANCE MUST BE EARTHED.IN THE INTERESTS OF ELECTRICAL SAFETY, A 30mA RESIDUAL CURRENT DEVICE (RCD) MUST BE INSTALLED IN ALL UK 230-240V ELECTRIC SHOWERS AND PUMPED CIRCUITS. THIS MAY BE PART OF A CONSUMER UNIT OR A SEPERATE UNIT.A suitably rated double-pole isolating switch for supply disconnection must be incorporated in the fixed wiring circuit in accordance with current wiring rules. This must have a mechanical indicator showing when the switch is in the OFF position. A neon lamp alone is not sufficient. (See the electrical rating chart for minimum switch rating). If it is fitted in the bathroom it must be the cord-operated type. The switch must be readily accessible and clearly identifiable in zone 3, i.e. at 0.6metres horizontally from the shower cubicle or edge of the bath, or located above zone 2 (i.e. adjacent to the shower cubicle or bath, but at least 2.25metres from the floor) as detailed below. This requirement does not apply to the pull cord from the switch.Where shower cubicles are located in rooms other than bathrooms, any socket outlet in the room must be situated at least 3 metres from the shower cubicle and protected by 30mA RCD.
Zone 2
Switch must be outside Zone 2
Zone 2
Switch must be outside Zone 2
Zone 1
Zone 1
Zone 2
Zone 2
Zone 0
Zone 2
Zone 1
Zone 1
Zone 2
2.25m
Zone 2
Zone 3
Zone 0Zone 2
2.25mZone 3
0.6m
0.6m
0.6m
0.6m
Mains voltage connection! Please refer to the typical system diagram opposite. The following notes are for guidance only the installation must comply with current regulations.
1 The shower unit must only be connected to a 230-240V ac supply.
2 Before making electrical connections within the installation make sure that no terminal is live. If in doubt, switch off the whole installation at the consumer unit or switch fuse (where fitted).3 The shower unit must be connected to its own independent electrical circuit. It MUST NOT be connected to a ring main, spur, socket outlet or lighting circuit, otherwise the circuit will overheat..
4 Check that the consumer unit (main fuse box): A has a main switch rating of 80A or above and B has a spare fuse way which will take the fuse/mcb (miniature circuit breaker) you need to fit. If so you can wire the shower direct to the consumer unit (please refer to the typical system diagram below). (Not all consumer units accept a 35/40/45A sized fuse).5 If the consumer unit has a rating below 80A or if there is no spare fuse way, then the installation will not be straightforward. It may be necessary to install a new consumer unit to service the whole house or just the shower. This should be installed by a qualified person. It may be necessary to contact the electricity supplier to upgrade the incoming supply.
Recommended 80A or 100A mains switch
RCD (can be part of consumer unit)
Double pole isolating switch – pull cord or wall mounted in accordance with BS7671
Shower unit
Electrical ratingRefer to the electrical rating diagram (shown overleaf) to determine the nominal current of the shower. The current rating of the supply cable must be at least that of the shower itself. Use the rating chart to choose a fuse or mcb with a rating of less than that of your chosen cable. ! WE STRONGLY RECOMMEND NOT USING REWIRABLE FUSES. The current rating will be reduced if the cable is to be: A. Bunched with others B. In an ambient temperature above 40ºC C. In an insulating wall or within thermal insulation, e.g. loft insulation. D. In any other unusual position If in doubt about any aspect of electrical installation, consult a qualified electrical engineer or the electricity supplier.Wiring installation1 For most installations the removable service tunnel will not be required, enabling the earth connection to be made in the top right hand corner of the unit as illustrated.! If retro-fitting the unit to an existing shower where the wiring cannot be connected as above, it may be necessary to utilise the service tunnel and alternative earth connection position.2 Replace the service tunnel and secure using the fixing screw provided.
3 Unclip the earth terminal block and reposition it into the holder on the service tunnel.4 Any cable MUST NOT have the outer insulation stripped back beyond the bottom of back plate or service tunnel (if used) and must be protected from water as shown.Earth bonding! The installation must be earth bonded in accordance with current regulations Where earth bonding of the premises is not evident, it may be necessary to run bonding cable back to the earth terminal at the consumer unit.Shower head installationThe shower head should be sited close to the shower unit, not necessarily on the same wall, but not so that the unit is subjected to continuous spray. The shower head should be sited so that it is no more than 610mm (2ft) above the bottom of the unit or no lower than 305mm (1ft) below the unit, when in its normal position in the shower head holder. ! THE SHOWER OUTLET, HOSE AND HANDSET ACT AS A VENT. THEY MUST NOT BE BLOCKED, OBSTRUCTED OR HAVE CONNECTED TO THEM ANY FITTING NOT APPROVED BY US. THE USE OF UNAPPROVED ACCESSORIES MAY INVALIDATE THE GUARANTEE AND MAY AFFECT THE PERFORMANCE AND SAFETY OF THE UNIT.1 Prepare two fixing points 465 470mm vertically apart using the fixings provided, if suitable.2 Pass the rail through the handset holder whilst keeping the slider button depressed.3 To comply with current water supply regulations, the handset should not be able to pass a point 25mm above the spill over level of the bath or tray. If this is not achieved, then the hose restraint/gel hanger must be used Slide this onto the rail under the handset holder.
4 Fit the rail into the rail end bodies taking care to engage the location slot onto the lugs.5 Secure the rail assembly to wall using the fixings provided, if suitable, ensuring the rail and rail end bodies remain firmly engaged.6 Place the rail end caps into the rail ends and push firmly into position.Please complete the commissioning procedure detailed below prior to connecting the handset and hose.7 Ensuring the hose washers are in the correct position, depress the anti-swivel locking button on the handset and secure the handset to the hose. Place the handset into the handset holder.! THE TENSION OF THE HANDSET STATION OF THE HANDSET HOLDER IS FACTORY SET. HOWEVER, IT MAY BE NECESSARY, TO TIGHTEN THE TENSION AS REQUIRED. TIGHTEN THE SCREW INSIDE THE HANDSET STATION TAKING CARE NOT TO OVER-TIGHTEN.Front cover preparationWhen the pipe work and electrical connections have been completed the front cover can be prepared to be fitted prior to beginning the commissioning procedure.1 Remove the relevant pipe work and cable entry point from the relevant section of the front cover if required, using a suitable tool. We recommend making good the cut out section using a round file. Ensure the cover fits over cables and pipe correctly.2 Fix the self tapping screws a couple of turns into the fixing points at the top and bottom of the unit to aid locating the fixing points when securing the front casing to the back plate.Front cover installation and shower commissioning! This shower must be fully commissioned following the procedure detailed below before use. Failure to do so could damage the shower and invalidate the guarantee.
1 Without fitting the shower head, fit the hose washer into the hose and attach to the shower outlet to allow the water to discharge safely to waste.2 Ensuring the electric supply remains isolated turn on the water supplies. Push the solenoid piston up until water runs through and out of the hose for a few seconds before releasing the piston.3 Attach the hose to the shower handset as detailed above after passing it through the hose restraint/gel hanger (if required) and place in the handset holder in a position where it can spray safely. Push the solenoid piston up until water sprays through the handset for a few seconds before releasing the piston.4 Turn the flow control valve on the shower unit to the full cold (6 o’clock position). Turn the flow control lever on the front casing to the full cold position (9 o’clock). The flow control valve and lever are keyed and must be correctly positioned in order for the cover to fit.5 Hold the cover next to the shower unit on the wall and carefully attach the two solenoid connectors. Place the solenoid connector block into the saddle within the shower unit and neatly tuck the wires into the recess provide.6 With the self tapping screws partially fitted to the fixing locations in the front casing, carefully offer it onto the back plate assembly ensuring the wires are not trapped. The control knob, in the fully cold position, may have to be slightly adjusted to enable the keyways to align.7 Secure the front cover to the base plate using the 3 fixing screws taking care not to overtighten.
10 Slowly turn the flow control knob towards the hot direction. The heater elements should now be hotter and the temperature of the spray should increase.11 Adjust the flow control knob to provide the desired temperature. Allow a few seconds after each adjustment for the temperature to stabilise. A cool shower can be achieved with the flow control knob set towards the cold direction. The temperature achieved will depend on the incoming water temperature and pressure.12 When the unit is fully commissioned please remove the red warning label from the front of the shower casing.User InstructionsTo turn on and set the temperature 1 Turn on the isolating switch. 2 Press the start/stop button, the blue light ring shouldilluminate. 3 Rotate the control knob to give the desired temperature;clockwise for warmer and anticlockwise for cooler. Allow a few seconds after each adjustment for the temperature to stabilise. ! WARNING: ALWAYS CHECK THE SHOWERING TEMPERATURE BEFORE STEPPING INTO THE SHOWER. IT WILL TAKE APPROXIMATELY 20 SECONDS TO REACH A STABLE TEMPERATURE. To turn the shower off 1 Press the start/stop button. 2 Turn off your isolating switch. N.B. The phased shutdown feature of this shower requires the shower to run on for a few seconds after the shower is turned off. This is a safety feature which flushes any residual hot water out of the shower unit to protect the next user. Shower head operation ! NEVER ATTEMPT TO MAKE ANY ADJUSTMENT TO THE SHOWER HEAD BY PULLING ON THE SHOWER HOSE.1 To select the preferred height for the shower head, depress the handset holder button fully to enable the slider to be moved up or down the rail.2 Angular adjustment is made by carefully but firmly pulling forwards or pushing back the shower head against the knuckle in the holder.3 To select the desired spray pattern rotate the shower spray plate clockwise or anti-clockwise.
8 Turn the flow control knob to ensure it moves smoothly. If not, the knob may be fitted incorrectly. The shower should be commissioned with the knob in the mid position (12 o’clock).9 Turn on the electrical isolation switch. Press the start stop button and ensure the blue light surround illuminates.
References
[xyz-ips snippet=”download-snippet”]