Arozzi Arena Assembly Guide

ARENA ASSEMBLY GUIDE

SCREWS AND TOOLS

READ MORE AT AROZZI.SE / AROZZI.COM

ARENA ASSEMBLY GUIDE

STEP 11. Put the one foot of a leg, and take the screw package labeled A with 8x M6x15mm screws for the feet.

2. Insert tighten the four screws, repeat the procedure for the other leg.

STEP 44. Place the parts you just assembled on the legs as shown below. Screw them together loosely with package C Repeat procedure for the other side.Now the frame is done, DO NOT tightens the screws yet.

STEP 77. The screws in the last remaining package, E will hold the cable management net in place. Put them in the remaining holes as shown. Now tighten all the screws from previous steps

STEP 88. Put the net on by placing the loops over bolt heafs.

READ MORE AT AROZZI.SE / AROZZI.COM

ARENA ASSEMBLY GUIDE

STEP 55. Find a flat surface to place the desk boards on, make sure you protect the surface. You can use the Styrofoam packing in the box to put under the desk boards and place the three boards desktop side down. Align them as shown and slide the pegs into the holes so that they fit as close as possible.

STEP 66. Now put the metal frame feet upward and secure it to the desktop by inserting the screws in package D to the metal frame.

READ MORE AT AROZZI.SE / AROZZI.COM

ARENA ASSEMBLY GUIDE

STEP 99. Before you turn the table you can adjust the height, loosen the screw closet to each foot and then pull up the leg raise the height. You can use measurement tape to set your preference.

STEP 1010. After you have set your desired please make sure it is stable. When you are done and have the desk standing, use a level and make sure it is flat and the feet are firmly on the ground.

STEP 1111. Roll out the mousepad and you are all done!Arozzi Arena Assembly Guide – Arozzi Arena Assembly Guide –

[xyz-ips snippet=”download-snippet”]


Posted

in

by