LOGICOOL Complete Standard Range U-PZ3 Instruction Manual
Overview
1 |
Mounting Hole (4-R6.5), anchor bolt:M10 |
2 |
Refrigerant tubing (liquid tube), flared connection (06.35) |
3 |
Refrigerant tubing (gas tube), flared connection (012.7) |
1 | Mounting hole (4-R6.5), anchor bolt : M10 |
2 | Refrigerant tubing (liquid tube). flared connection (0 6.35) |
3 | Refrigerant tubing (gas tube), flared connectionU-60PZ3E5 (012.7)U-71PZ3E5 (015.88) |
1 |
Mounting hole (4-R6.5), anchor bolt : M10 |
2 |
Refrigerant tubing (liquid tube) flared connection (09.52) |
3 |
Refrigerant tubing (gas) flared connection (15.88) |
4 |
Refrigerant tubing port |
5 |
Electrical wiring port (013) |
6 |
Electrical wiring port (022) |
7 |
Electrical wiring port (027) |
8 |
Electrical wiring port (035) |
When using a drain pipe, install the drain socket (field supply) on to the drain hole. Seal the other drain hole with the rubber cap.
[xyz-ips snippet=”download-snippet”]