LOGICOOL Complete Standard Range U-PZ3 Instruction Manual

LOGICOOL Complete Standard Range U-PZ3 Instruction Manual

Overview

1

Mounting Hole (4-R6.5), anchor bolt:M10

2

Refrigerant tubing (liquid tube), flared connection (06.35)

3

Refrigerant tubing (gas tube), flared connection (012.7)

 

1 Mounting hole (4-R6.5), anchor bolt : M10
2  Refrigerant tubing (liquid tube). flared connection (0 6.35)
3 Refrigerant tubing (gas tube), flared connectionU-60PZ3E5 (012.7)U-71PZ3E5 (015.88)

 

 

 

1

Mounting hole (4-R6.5), anchor bolt : M10

2

Refrigerant tubing (liquid tube) flared connection (09.52)

3

Refrigerant tubing (gas) flared connection (15.88)

4

Refrigerant tubing port

5

Electrical wiring port (013)

6

Electrical wiring port (022)

7

Electrical wiring port (027)

8

Electrical wiring port (035)

When using a drain pipe, install the drain socket (field supply) on to the drain hole. Seal the other drain hole with the rubber cap.

 

[xyz-ips snippet=”download-snippet”]


Posted

in

by