BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY

  • Check the pack and make sure you have all the parts listed.
  • When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
  • Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.Dip Treated buildings – Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingressPressure Treated buildings – Require a waterproof treatment to prevent water ingressLog Cabins – Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

  • Concrete 75mm laid on top of 75mm hard-core.
  • Slabs laid on 50mm of sharp sand.

Whilst all products manufactured are made to the highest standards of Safety and in the case of children’s products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

All buildings should be erected by two adults

For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.For ease of assembly, you will need a tape measure to check dimensions of components.

Winter = High Moisture = Expansion Summer = Low Moisture = Contraction

CAUTIONEvery effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.

Aquatanundiluted contains: Boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

03VER0808-V2

Overall Dimensions:

Length 2411 mm
Width 2484 mm
Height 2569 mm

Base Dimension

Length 2350 mm
Width: 2360 mm

  1. Door PanelQTY 1AI-03VERDP2360X2015-V1
  2. Window Panel RightQTY 1AI-03VERWPR2310X2007-V1
  3. Window Panel LeftQTY 1AI-03VERWPL2310X2007-V1
  4. Back PanelQTY 1AI-03VERBP2360X2015-V1
  5. Gable TopQTY 2AI-03VERGT2310X546-V1
  6. FloorQTY 2AI-03TAGF2360X1175-V1
  7. Roof SheetQTY 2PI-03-0242
  8. Master DoorQTY 1AI-03FGMD1720X475-V1
  9. Slave DoorQTY 1AI-03FGD1720X475-V1
  10. Side DoorQTY 2AI-03FGSD475X1720-V1
  11. Roof Support Bar – 28 x 28 x 2304mmFS2828-2304
  12. Eaves Frame – 28 x 28 x 1195mmQTY 4FS2828-1195
  13. Cover Trim – 12 x 40 x 1976mmQTY 4S1240-1976
  14. Fascia – 12 x 60 x 1333mmQTY 4S1260-1333
  15. Finial QTY 2SHED DIAMOND FINIAL
  16. Rain Guard – 28 x 44 x 680mmQTY 2RG2844-680
  17. Butt HingeQTY 14PI-07-0066
  18. Door HandleQTY 2PI-07-0081
  19. Barrel BoltQTY 6PI-07-0114
  20. Turn ButtonQTY 2PI-07-0034
  21. Press LockPI-07-0162
  22. “L” BracketQTY 2PI-07-0012
  23. Door strip- 12 x 60 x 1720mmQTY 2S1260-1720
  24. Door support framing – 28 x 28 x 2304mmQTY 1F2744-2304

Nail Bag

  • 35mm Bolt QTY 4
  • 50mm Screws QTY 70
  • 40mm Screws QTY 38
  • 30mm Screws QTY 44
  • 30mm Black Screws QTY 2
  • 25mm Screws QTY 76
  • 10mm Screws QTY 38
  • Felt Tacks QTY 110

Pre Assembly

Remove the transportation blocks from the bottom and top of each panel before beginning assembly.

Step 1Attach the side doors to the inside framing of the door panel using 3x butt hinges per door.

  • Fix to the door using 3x25mm screws & 3x30mm screws to the framing per hinge, ensure the doors open freely, folding back into the building unrestricted.18x25mm Screws18x30mm Screws

Fix the hinge flaps to the inside of the doors.

Step 2

Fix the master and slave door to the attached side doors with 8x butt hinges, using 6x25mm screws per hinge.

  • Ensure the doors open freely, folding back into the building unrestricted.48x25mm Screws

Step 3

Secure the barrel bolts to the top & bottom of each side door and the slave door using 6 x 10 mm screws.

Attach the press lock to the master door with 4x25mm screws, aligning the barrel with the key hole.

  • Ensure the key turns and locks properly before fixing to the door.

Fix the door handles to the outside of the master and slave door usingthe 35mm bolts provided.

35mm bolts provided.36x10mm Screws4x25mm Screws4x35mm Bolts

Step 4

Place the floor panels upside down onto a firm and level base. Ensure the base has suitable drainage, free from areas where standing water can collect.

Secure the floors together using 8 x 50 mm screws through the floor bearers in an alternating pattern.

Once fixed together turn the floor back the right way up.

8x50mm Screws

 

Step 5

  • A. Fix the corners with 50mm screws as shown in the illustration.
  • B. Do not secure the building to the floor until the roof fitted.

3x50mm Screws

Step 6

  • A. Fix the corners with 50mm screws as shown in the illustration.
  • B. Do not secure the building to the floor until the roof fitted.

9x50mm Screws

Step 7

Place the gable tops onto the window panels, ensuring the boards interlock.Secure in place using 4x50mm screws per gable top, screwing in an alternating pattern.

8x50mm Screws

Step 8Attach the “L” brackets to each end of the ridge bar with 2x25mm screws per bracket.

  • Ensure the brackets are flush with the ends of the ridge bar.

Align the ridge bar between the gables and secure to the central uprights with 2x25mm screws per bracket as shown in the illustration.8x25mm Screws

Step 9

Attach 2x eaves frames to the long side of each roof sheet, ensuring the frames are flush to the edges, securing in place with 3x30mm screws per frame.Place each roof sheet onto the building and fix into place using 12x40mm screws per roof.

12x30mm Screws24x40mm Screws

Step 10

B. Secure the building to the floor using 36x50mm screws.

  • Ensure to screw through the framing into the floor bearers.36x50mm Screws

Step 11Cut the felt into 3 strips of 2500mm length and place onto the roof, as shown in the illustration.

  • Ensure there is approximately 50mm overhang of felt around all sides of the building.Fix into place using 110x felt tacks at 100mm intervals.110x Felt Tacks

Step 12Screw the cover trims to each corner of the building with 3x30mm screws per trim.12x30mm Screws

Step 13

Attach the fascia’s and finial’s to the the front and back of the building using 12x40mm screws.12x40mm Screws

Step 14Fix the rain guards above each window, securing in place using 2x50mm screws per guard, ensuring to screw through the framing.4x50mm Screws

Step 15Place the Door support bar (No. 24) to the inside of the door panel as displayed on the pictures.This framing will meet at each side panel as show in image 2.The 44mm side of the framing should sit against the inside of the door panel, matching the width of the door frame timber.

  • Ensure that the framing is attached in a straight line matching the line of the top of the door frame.
  • Please be aware this piece of framing may need to be adjusted to length by customer in regards of building tolerances. This piece of framing should fit tightly between the two side panels.

 Before

Step 16

Screw through the side panel externally in line with the 2 x 1 framing using 1 x 70mm screw in either side to secure the framing in place.

Screw through the front panel externally with 4 x 70mm screws equally spaced a part along the door frame to secure the 2 x 1 framing to the panel.

  • Please ensure you pre-drill prior to screwing into the panel to eliminate the chances of the timber splitting.

A. Drill 3 x 6mm holes into the2 x 1 framing in line with your barrell bolts. These will act as the catch for the barrell bolts at the top of your door.

  • Ensure the holes are drilled in to the 2 x 1 framing attached in step 15 as oppose to the door frame.

                     After

Step 17

Attach the two turn buttons to the slave door at the top and bottom using 2x30mm black screws.

2x30mm Black Screws

  • These turn buttons help to keep your doors straight during high & low levels of moisture content in the air.

Step 18

Attach a strip to the hinged side of the middle opening doors.

These strips allow you to adjust the doors allowing for moisture absorbtion and reduction.6x30mm Screws

Step 19

It is recommended that after the construction, treatment and the removal of the protective window cover that sealant is used to keep the building weather tight.

 

 