Mercia Overlap apex shed Instructions

Mercia Overlap apex shed Instructions

Overlap Cladding

Shiplap Cladding

Fixed Windows

Opening Windows

No Windows

Solid Sheet Floor

T&G Floor

Solid Sheet Roof

T&G Roof

Refer to the instructions pages for you specific product code

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY

  • Check the pack and make sure you have all the parts listed.
  • When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
  • Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.

Our buildings are pre treated with a water based treatment**; this only helps to protect the product during transit and for upto 3 months against mould. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in accordance with the manufactures recommendations. Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.

Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

– Concrete 75mm laid on top of 75mm hard-core.– Slabs laid on 50mm of sharp sand.

Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

For Assistance Please Contact Customer Care on 01636 880514

**Protim Fentex E5**Biocidal Product Regulation (EU 528/2012) Article 58 InformationProtim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products.Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood.Avoid breathing dust when cutting treated or untreated wood.Dispose of off-cuts responsibly – do not burn.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QNwww.merciagardenproducts.co.uk

Overall Dimensions:Length = 1794mmWidth = 1199mmHeight = 1863mm

Base Dimensions:Length = 1753mmWidth = 1175mm

Before assembly please make sure you have a suitable base ready to erect your building

Building content

Pre Assembly

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

Step 7

Step 8

Step 9

Step 10

Step 11

Step 12

References

[xyz-ips snippet=”download-snippet”]