Tag: Soil Temperature Profile Probe

  • METER TEROS 06 Soil Temperature Profile Probe User Guide

    METER TEROS 06 Soil Temperature Profile Probe User Guide

    METER TEROS 06 Soil Temperature Profile Probe Preparation Confirm that TEROS 06 components are intact. For installation, gather the TEROS 06 Auger, a dead blow hammer, pvc casing or flexible conduit, a cable inserting tool, a spade, and a level.Determine the desired installation location, avoid roots and rocks, and mark the drilling depth (104 cm…