ULINE S-7447 2-1 Quart Paint CAN Shipper Installation Guide

ULINE S-7447 2-1 Quart Paint CAN
Shipper Installation Guide

ASSEMBLY INSTRUCTIONS

  1. Fold flaps on bottom of carton so that they meet.  Manufacturer’s certification must be visible on the  outside of the carton. (See Figure 1)
  2. Seal bottom of carton down the center seam with one  strip of 2″ wide (2 mil) polypropylene tape (Uline Model  # S-472). The tape must extend 3″ over each end of the carton. (See Figure 2)
  3. Fill cans. Do not overfill.
  4. Secure lids completely on cans by applying even pressure with a paint can closer until lids are fully nested. (See Figure 3)
  5. Align locking rings evenly over can lids and secure by applying even pressure with a paint can closer. Make sure rings snap into place. (See Figure 4)
  6. Place cans into carton – bottom first.
  7. Fold flaps on top of carton so that they meet. “THIS SIDE UP” must be visible on the outside of the carton. (See Figure 5)
  8. Seal top of carton down the center seam with one strip of 2″ wide (2 mil) polypropylene tape (Uline Model # S-472). The tape must extend 3″ over each end of the carton. (See Figure 6)

1-800-295-5510uline.com

[xyz-ips snippet=”download-snippet”]


Posted

in

by