ULINE SDS Compliance Center Installation Guide

1-800-295-5510uline.com

SDS COMPLIANCE CENTER

TOOLS NEEDED

            Drill      Phillips Screwdriver

     Hammer

INSTALLATION

 NOTE: Before drilling holes in wall for mounting, be sure there are no pipes or wires in the wall which could be hit by the drill bit.

  1. Using the board as a template, mark 4 holes on the wall. Use a 1/4″ bit to drill holes.
  2. Gently tap the wall anchors into place until the face of the wall anchor is flush with the wall surface.
  3. Mount the board to the wall with screws through holes #1 and #2. Tighten screws into wall anchors until secure.
  4. Mount the wire basket to the board with screws through holes #3 and #4. Tighten screws into wall anchors until secure.

0721 IS-15383

[xyz-ips snippet=”download-snippet”]


Posted

in

by