Tag: Recycled Double Receptacle
-
ULINE H-7238 Recycled Double Receptacle Installation Guide
ULINE H-7238 Recycled Double Receptacle TOOLS NEEDED PARTS ASSEMBLY Verify all parts are present before beginning.NOTE: Before starting, note that four resinwood slats are longer (33″) than the rest to lift can off the ground. These must be evenly spaced apart with shorter (32″) slats between them. Take the bottom ring and begin with one…