Tag: Meter
-
METER ZL6 Basic Data Logger User Guide
METER ZL6 Basic Data Logger Preparation Inspect and verify ZL6 Basic components are intact. Installation will require a mounting post.Install the enclosed batteries and press the TEST button. The status lights will eventually settle to a short, single green blink every 5 s, signaling it is ready for use.Read the full ZL6 User Manual at…
-
METER TEROS 10 Soil Moisture Sensor User Guide
METER TEROS 10 Soil Moisture Sensor User Guide TEROS 10 QUICK START Preparation Inspect and verify TEROS 10 components. The TEROS verification clip gives the best assessment of proper sensor function and accuracy. The TEROS 10 should read 0.35 to 0.42 m3/m3 on the verification clip. If a verification clip is not available, test basic…
-
METER TEROS 12 Advanced Soil Moisture Sensing User Guide
METER TEROS 12 Advanced Soil Moisture Sensing Preparation Inspect and verify the sensor components (TEROS 11 Soil Moisture and Temperature or TEROS 12 Soil Moisture, Temperature, and Electrical Conductivity). The TEROS verification clip gives the best assessment of proper sensor function and accuracy. The TEROS 11/12 should read 0.332 to 0.363 m3/m3 on the verification…
-
METER TEROS 21 Soil Water Potential Sensor User Guide
METER TEROS 21 Soil Water Potential Sensor Preparation Inspect that TEROS 21 components are intact. An auger or shovel and casing to protect the cable will be needed for installation. When using the sensors in lightning-prone areas, follow the directions for providing protection for the sensors in the application note Lightning surge and grounding practices (metergroup.com/environment/articles/lightning-surge-grounding-practices)Set…
-
AQUALAB TDL Water Activity Meter User Guide
AQUALAB TDL Water Activity Meter User Guide AQUALAB TDL QUICK START Preparation Inspect and verify that all AQUALAB TDL components arrived in good condition. Select a clean, level location where the temperature is stable. Locations with high temperature variability (e.g., next to air conditioners, heater vents, or open windows) can affect the accuracy of readings.…
-
SC-1 Leaf Porometer User Guide
SC-1 Leaf Porometer ® SC-1LEAF POROMETERSC-1 QUICK START10243-06 6.30.2020 Preparation Confirm that SC-1 components are intact. Connect the SC-1 sensor head to the SC-1 controller with the serial port and install the batteries into the SC-1 controller. Fill the black desiccant chamber approximately 3/4 full with fresh desiccant. Orient the black desiccant chamber vertically so…
-
METER TEMPOS Thermal Properties Analyzer User Guide
METER TEMPOS Thermal Properties Analyzer User Guide TEMPOS QUICK START Preparation Confirm that TEMPOS components are intact, including the selected sensors. Read the full TEMPOS Manual at metergroup.com/tempos-support. All products have a 30-day satisfaction guarantee. Sample Considerations Measurements are best taken in a thermally stable environment such as a Styrofoam box. Avoid outside sources of…
-
METER TEROS 06 Soil Temperature Profile Probe User Guide
METER TEROS 06 Soil Temperature Profile Probe Preparation Confirm that TEROS 06 components are intact. For installation, gather the TEROS 06 Auger, a dead blow hammer, pvc casing or flexible conduit, a cable inserting tool, a spade, and a level.Determine the desired installation location, avoid roots and rocks, and mark the drilling depth (104 cm…
-
TEROS 31 Tensiometer User Guide
TEROS 31 Tensiometer Preparation Confirm TEROS 31 components are intact. For installation, gather the tensiometer auger, a refilling syringe (purchased separately), a refilling rack (purchased separately), and deionized water.Determine the desired installation angle and calculate the corresponding installation depth. METER recommends conducting a system check with a logger prior to installation. NOTE: A barometric reference…
-
METER AQUALAB 3 One Minute Water Activity User Guide
AQUALAB 3 AQUALAB 3 QUICKSTART PreparationConnect the Apple®iPad®mobile digital device to the Wi-Fi®network. If the iPad is new, it must be set up and associated with an Apple ID. Please refer to the AQUALAB 3 help file (metergroup.com/ aqualab3-training) for additional setup configurations, if needed.NOTE: The iPad must use a Wi-Fi or Ethernet…